From Inquiry to Live Deployment

A proven 4-phase process refined across 70+ city deployments. Transparent timelines, dedicated engineers, guaranteed SLA.

Home › How We Work
Our Process

4 Phases to a Live System

1
Site Assessment
Remote or on-site survey. We analyze your location, traffic patterns, and infrastructure to design the optimal solution.
2
Solution Design
Custom hardware BOM, software configuration, network architecture, and ROI projection delivered within 48 hours.
3
Deployment
Our certified field engineers handle installation, calibration, and system commissioning. Typical deployment: 3–14 days.
4
Operations & Support
24/7 remote monitoring, SLA-backed support, and continuous AI model updates. Your system improves over time.
Field Installation
Phase 3: Deployment

Professional Field Installation

Our certified installation teams deploy hardware with minimal disruption to existing operations. All cameras and sensors are calibrated on-site and connected to the AIPark OS cloud platform.

Typical roadside deployment: 50 spaces per day. Campus system: 3–5 days for full commissioning. Highway gantry: 1–2 days per site.

All installations include a 30-day commissioning period with daily performance reports and free adjustments.

Phase 4: Operations

Continuous Monitoring & Optimization

Post-deployment, our operations team monitors system health 24/7 from our Beijing NOC. AI models are updated quarterly with new training data from your deployment.

SLA commitments: <4h response for critical issues · <24h resolution for hardware faults · 99.5% uptime guarantee.

Annual system reviews include performance benchmarking, capacity planning, and technology refresh recommendations.

Operations Center
Typical Timeline

From Inquiry to Live: 4–6 Weeks

Day 1–2

Initial Consultation

Sales engineer reviews your requirements. Site survey scheduled (remote or on-site).

Day 3–5

Proposal & BOM Delivery

Custom hardware list, software configuration, network diagram, and ROI projection delivered.

Week 2–3

Contract & Hardware Preparation

Agreement signed. Hardware configured and tested at our facility. Sample units shipped for approval.

Week 4–5

Field Installation

Certified engineers deploy hardware on-site. Network and cloud platform configured.

Week 6

Commissioning & Go-Live

System testing, staff training, and official go-live. 30-day hypercare support begins.